Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Oct 22, 2021     Right wingtip leds - (4 hours)       Category: Lighting
Match drilled right forward facing PCB to right wingtip cove for nut plates. Installed 4 nut plates since the 5th on on top of the left wingtip was difficult to install and seemed excessive. Stripped and soldered wire ribbons that connect the two PCBs. Installed wire ribbons on outboard facing PCBs. Installed taxi/landing for fit. Installation was a PITA.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.